Infrastructure

With a capital of more than 74 billion VND, the substation is equipped with 2 transformers of 63 MVA, one of which will be operational in the first phase.

DVIZ is equipped with a treated water supply system distributing water to the clients via an underground network of HDPE pipes. This system is connected to the city network with capacity of 12,500 m3/day.

01BE1346 D324 4E63 9EB8 E88C073E6D15

Dinh Vu Industrial Zone

-